Factory Supply Cold Rolled Hot Rolled 304/L 316/L Stainless Steel Seamless Tube

Product Details
Customization: Available
Standard: ASTM, AISI, GB, JIS, DIN, EN
Certification: ISO, CE SGS
Still deciding? Get samples of US$ 100/Piece
Request Sample
Diamond Member Since 2021

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Fast Delivery
The supplier can deliver the goods within 15 days
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
Product Certification
The supplier's products already have relevant certification qualifications, including:
CE
to see all verified strength labels (12)
  • Factory Supply Cold Rolled Hot Rolled 304/L 316/L Stainless Steel Seamless Tube
  • Factory Supply Cold Rolled Hot Rolled 304/L 316/L Stainless Steel Seamless Tube
  • Factory Supply Cold Rolled Hot Rolled 304/L 316/L Stainless Steel Seamless Tube
  • Factory Supply Cold Rolled Hot Rolled 304/L 316/L Stainless Steel Seamless Tube
  • Factory Supply Cold Rolled Hot Rolled 304/L 316/L Stainless Steel Seamless Tube
  • Factory Supply Cold Rolled Hot Rolled 304/L 316/L Stainless Steel Seamless Tube
Find Similar Products
  • Overview
  • Product Description
  • Our Advantages
  • Product show
  • Packaging & Shipping
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
201/304l/321/316l/321/316l/309/310s/317/347/409
Specification
φ 12
Origin
China
HS Code
7306400000
Production Capacity
10000ton/Month

Product Description

201 304 316 Welded Decorative Stainless Steel Pipe Tube
Product Description

Factory Supply Cold Rolled Hot Rolled 304/L 316/L Stainless Steel Seamless Tube

Our Advantages

Factory Supply Cold Rolled Hot Rolled 304/L 316/L Stainless Steel Seamless TubeFactory Supply Cold Rolled Hot Rolled 304/L 316/L Stainless Steel Seamless TubeFactory Supply Cold Rolled Hot Rolled 304/L 316/L Stainless Steel Seamless Tube
Factory Supply Cold Rolled Hot Rolled 304/L 316/L Stainless Steel Seamless Tube

Thickness
0.5-100mm  or customized
outer diameter 6-800mm
Length 3-12m
Surface BA/2B/NO.1/NO.4/8K/HL
Quality  test we can offer MTC(mill test certificate)
Payment terms T/T  L/C(30%DEPOSIT)
Stock or not  enough stock
Sampie Provided stock
Delivery time within 7-10 Working Days
Grade 304.304L.321.316.316L.316H.316Ti.316LN.317.317L.904L.309S.310S.C-276.C-22.C-2000.C-4.B-2.B-3.G-3.G-30.2550.2507.2205.2520.2101.2304.904L.724L.725LN.etc

Factory Supply Cold Rolled Hot Rolled 304/L 316/L Stainless Steel Seamless Tube

Product show

 

Factory Supply Cold Rolled Hot Rolled 304/L 316/L Stainless Steel Seamless TubeFactory Supply Cold Rolled Hot Rolled 304/L 316/L Stainless Steel Seamless Tube
Thickness Cold rolled:0.3-3mm
Hot rolled:3-100mm  or customized
size wall thickness:
Length 3-12m
Surface BA/2B/NO.1/NO.4/8K/HL
Quality  test we can offer MTC(mill test certificate)
Payment terms T/T  L/C(30%DEPOSIT)
Stock or not  enough stock
Sampie Provided stock
Container Size 20ft GP:5898mm(Length)*2352mm(Width)*2393(High)
40ft GP:12032mm(Length)*2352mm(Width)*2393(High)
40ft HC:12032mm(Length)*2352mm(Width)*2698(High)
Delivery time within 7-10 Working Days
Grade 304.304L.321.316.316L.316H.316Ti.316LN.317.317L.904L.309S.310S.C-276.C-22.C-2000.C-4.B-2.B-3.G-3.G-30.2550.2507.2205.2520.2101.2304.904L.724L.725LN.etc
Packaging & Shipping

Factory Supply Cold Rolled Hot Rolled 304/L 316/L Stainless Steel Seamless Tube

Company Profile

 

Factory Supply Cold Rolled Hot Rolled 304/L 316/L Stainless Steel Seamless TubeFactory Supply Cold Rolled Hot Rolled 304/L 316/L Stainless Steel Seamless Tube
FAQ

Q1. What are your company's main products ?
A1: Our main products are stainless steel plate/sheet, coil, round/square pipe, bar, channel, etc.

Q2. How do you control quality ?
A2: Mill Test Certification is supplied with shipment, Third Party Inspection is available. and we also get ISO,SGS,Alibaba
Verified.

Q3: What is the terms of packing?
A3: generally, we pack our goods in bundles or coils with rods or belts, we could also pack the goods as the customers
requirement.

Q4:What is your delivery time?
A4: For stocks, we could transport the goods to loading port within 7 days after we received your deposit
For production period, it usually takes about 15 days-30 days after receiving the deposit.

Q5. What are the advantages of your company ?
A35: We have many professionals, technical personnel, more competitive prices and best after-dales service than other stainless
steel companies.

Q6. Can you provide sample ?
A6: We can provide the samll samples in stock for free, as long as you contact us.
Customized samples will take about 5-7days.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier